The challenge
Roof equipment interrupted the egress and maintenance path, while the fire-system routing and sprinkler distribution required design review.
Our approach
HINDAZA developed the IFC structural and MEP model to LOD 350, cleared the complete roof route and electrical-room approach, and revised the fire system through the project’s NFPA review.
The deliverable
Coordinated LOD 350 models and shop drawings documented the clear roof route, revised equipment arrangement and fire-system changes.