Skip to content
Industrial & Technical

Lucid Motors Factory

King Abdullah Economic City · Saudi Arabia

Lucid Motors Factory — project image from the HINDAZA 2026 profile

About the project

An electric-vehicle manufacturing facility within Lucid's AMP-2 development. The featured project phase comprises approximately 30,000 m² of buildings on a 320,000 m² site, integrating manufacturing accommodation, technical services and supporting external infrastructure.

HINDAZA’s scope

  • Architectural fit-out models to LOD 400 and LOD 500.
  • MEP models, shop drawings and as-built information.
  • Site modelling and coordination.
  • Steel calculations for demountable partitions.
Location
King Abdullah Economic City, Saudi Arabia
Project area
30,000 m² buildings
Project scale
320,000 m² site
Client
Mid & Meras JV (MMJV)

Related project experience

Wadi Al-Zarqa Wastewater Treatment Plant — project image from the HINDAZA 2026 profile

Wadi Al-Zarqa Wastewater Treatment Plant

Jordan · Jordan

A major wastewater infrastructure project planned to increase treatment capacity for the Amman-Zarqa area. The first phase is designed for approximately 150,000…

Aramco Stadium — project image from the HINDAZA 2026 profile

Aramco Stadium

Al Khobar · Saudi Arabia

A major football venue designed for approximately 47,000 spectators. The stadium and its surrounding masterplan extend across roughly 800,000 m², combining the…

Operational Assets Logistics Laydown Area — project image from the HINDAZA 2026 profile

Operational Assets Logistics Laydown Area

NEOM · Saudi Arabia

A temporary operational development supporting logistics and site activities within NEOM. The project combines storage, workshops, offices, parking,…